Roofing work – phased plan

Roofing is one of the most important attributes of any country house. Depending on the configuration, it can be pitched or flat. For its decor, you can use polyurethane moldings or any other material. Raise roof allows you to give the cottage a brighter look, so it is most often used in low -rise construction. Roofing works consist of several stages:

Installation of rafters that uses nails, brackets, metal plates or corners during fastening, which can be combined. Before proceeding with the arrangement of the rafters, it is necessary to determine the type of roofing, since the load on the system will depend on it, therefore, its design.

Installation of vapor barrier, especially necessary when it is planned to build an attic floor. All joints of vapor barrier materials must be glued in the most thorough way.

The device of the counterparty and black binder are carried out only after the vapor barrier layer has been laid.

Waterproofing and roof insulation are one of the most important and crucial stages of work, because the durability and reliability of all the roof in general depends on the quality of their implementation.

The device of the crate is necessary for laying a roofing on it, and its type is selected depending on the preferred roofing material. The crate is continuous or step -by -step, in addition, it can use different types of fasteners.

Additional waterproofing of the roof is laid if necessary, if this requires the selected roof type, its slope and material.

Detailing device, installation of the frontal board and installation of cornice planks.

Installation of the roofing material itself.

Installation of other components of the roof, snow retainers, weathercocks, gutters and heating systems.